Inside a three-week sprint

Sticky notes in pink, yellow and orange pinned across a grey board

Every engagement at Kinetic is built from the same unit: a three-week sprint with a dedicated pair, one Staff Designer and one Senior Creative Engineer, working on one client and nothing else. Founders often ask what actually happens inside those fifteen working days. Here is a typical one.

Before day one

A sprint starts before it starts. In the week before kick-off we read everything the client can share (the deck, the analytics, the existing repository) and send back a one-page sprint brief: the outcome we are aiming for, what is out of scope, and the three biggest risks we see. The client signs off on that page, not on a fifty-page specification.

Week one: decide and set up

Monday is the kick-off: two hours with the founders and whoever will own the product after us. We walk through the brief, agree on the success measure and set up the shared Slack channel. Tuesday and Wednesday belong to the designer: the core flows sketched, then drawn directly as tokens and components, while the engineer sets up the repository, CI, preview deployments and the hosting the product will run on. By Friday the first staging build is live: rough, but real, on the client's own infrastructure.

A team on sofas watching a colleague at a whiteboard
Wednesday of week two: the mid-sprint review, the one meeting longer than fifteen minutes.

Week two: build the hard part

The second week is where the risky part gets built: the integration with an unfamiliar API, the 3D scene, the pricing logic. We tackle it first because it is the part most likely to change the plan, and we want that news early. On Wednesday we hold the mid-sprint review: the client uses the build in front of us and we decide together what the last week is for. Most sprints change course a little here; very few change course a lot.

Week three: finish and hand over

The last week is for finishing: edge cases, empty states, error messages, accessibility checks, performance budgets and the content the client wants to launch with. On Thursday we record the architecture walkthrough and write the handover guide. On Friday the final build ships, the repository and every design file are transferred to the client's organization, and the pair is released. If there is another sprint, it starts with its own brief.

Why three weeks

We tried two and four. Two weeks left no room to recover from a surprise; the sprint became a race. Four weeks let scope creep in quietly, and clients waited too long between decisions. Three weeks is long enough to ship something meaningful (a marketplace flow, a design system foundation, a launch site with a 3D centrepiece) and short enough that everyone can hold the whole plan in their head.

What it costs

A sprint is a fixed price per scope, published on our home page: brand identity from $7,500, a production web application from $15,000, a 3D or WebGL experience from $9,000 and a headless CMS or commerce architecture from $6,000. The minimum engagement is a two-week, $15,000 sprint. No hourly billing, no surprises in the invoice.